Revised Schedule for Resurfacing Some Sunnyside Streets

Dept of Public Works has revised their schedule of expected dates for resurfacing streets. Sunnyside streets that are affected by these changes are shown in image below. Read full revised schedule here (PDF).

microsurfacing_2016_09_29

FROM DPW: Micro-surfacing Pavement Preservation is coming to your district

Micro-surfacing preserves the asphalt pavement by protecting the surface from the effects of natural aging and the environment caused by inclement weather, excessive heat and the searing effects of the sun. It can extend the life of pavement at a fraction of the cost by restoring the wearing surface of a roadway and sealing off any moisture and preventing oxidation that can cause deterioration and require more costly repairs down the road. Micro-surfacing will take 2 days to complete on a block, compared to several days/weeks for full roadway reconstruction which can include street base repairs and repaving.  The two dates for work and closing the street are usually 4-7 days apart.  (see October 5 through November 3 work schedule attached)

Public Notification

The contractor, Telfer Pavement Technologies, LLC mailed the attached “notice of construction” to property owners of properties on the affected blocks.   About 10 days before the work begins, residents and merchants at the affected locations will receive a 10 day “notice of construction” that will give the exact dates and time of work and will outline the “no parking” restrictions.  In addition, barricades will be placed on the sidewalks approximately 72 hours in advance of work beginning.   

The Micro Surfacing Preservation Process

Micro-surfacing is applied in dry, moderate to warm weather conditions. The process includes the use of a large steam-roller like truck that pours the micro-surfacing material on to the street. Workers will then use a long squeegee-like tool to spread the material evenly across the street.  Each block takes about 30 minutes to apply.  “Micro-surfacing” is a liquid-oil and crushed rock mixture that requires about four to five hours to dry under moderate weather conditions. Once completely dry, residents are able to walk and drive on it safely without tracking it onto sidewalks and driveways.

Learn more about the program at: www.sfpublicworks.org/microsurface

Grace L. Moore

Public Affairs Officer

Office  of Communications & Public Affairs

San Francisco Public Works

City and County of San Francisco

30 Van Ness Avenue, 5th Fl

San Francisco, CA 94102

Ph (415) 558-5282 Fx (415) 522-7723

sfpublicworks.org · twitter.com/sfpublicworks

 